Internationally, coal is currently the most widely used primary fuel, accounting for approximately 40% of the world's electricity production. This situation is likely to remain until at least 2020.
Nigeria is endowed with abundant coal reserve of the required quality necessary for power generation and with the support of the Nigerian Government particularly via the "Coal to Power Program", we have identified huge reserves of Bituminous and Lignite coal sufficient to generate power for at least 50 years.
Ramos Electric Power Ltd. has aligned with the current administration’s plan to generate 30 per cent of electricity needed in the country from coal.
Consequently, we have obtained coal exploration Licenses and are currently carrying out exploration activities in two states namely; (i) Kogi State, and (ii)Enugu State and we are currently working on developing these coal properties exclusively for power generation.
From feasibility studies, route selection, right of way/easement acquisition, and permitting through final design to construction and final inspection, Ramos Electric Power Limited has exceptional capabilities to provide the expertise necessary to successfully complete both underground and overhead transmission projects with distribution, communication and substation components. Our staff’s project experience has varied from sub-transmission through 345 kV and includes a wide range of design and construction approaches.
Our company’s experience includes a wide range of voltage levels for new, upgraded, and repaired facilities. The installation of foundations, lattice steel, tubular steel, wood pole structures, conductor and fibre optic ground wire and cables is our core expertise.
Our staff has experience studying feasibility and providing preliminary and final designs for lines with a wide variety of foundation, structure and configuration types. Each project has its own unique challenges, and special designs have been developed for projects with widely varying foundation, climate, and terrain conditions. Ramos Electric Power Limited own specialized transmission line construction equipment regardless of size or scope. We also deploy specialized transmission computer programs including SAG10, PLS-CADD, PLS-POLE, PLS-TOWER, PLS-SAPS, CAISSON, and LPILE. Ramos Electric Power Limited has the expertise and the equipment to get the job done.
Since inception, Ramos Electric Power Limited has applied its fully-integrated engineering, procurement and construction skills to its distribution work.
We perform both new plant installation and URD cable replacement on a scale matched by few other indigenous contractors. Our method of installation includes trenching, cable plowing and directional boring.
We have extensive experience in the installation of all "dry utilities" on new plant development. This work includes complete installation of not only electric distribution facilities, but also natural gas, telecommunications (including fiber optic cable), and cable television facilities in a shared trench.
Ramos Electric Power Limited is a Power Company with International alliances. That means Ramos Electric Power Limited has the ability to secure a qualified labour force anywhere in the world.
In addition, its relationship with various national and international manufacturers and suppliers help Ramos Electric Power Limited procure the necessary materials needed for a project.